Route 22 – Krayot bypass
Design and construction of electrical systems, traffic lights, control, and communications along a total length of approximately 18 km of road, 5 interchanges and 19 bridges, under- and overpasses, relocation of communication lines on a significantly large scale, construction of lighting systems for highways, bridges, control systems, traffic light systems, architectural lighting, and advertising infrastructure. The project was conducted with Shapir Engineering for Netivei Israel.